GCP placement strategy for long linear projects
Working on a 3-mile corridor survey for a proposed road alignment. 200ft wide corridor. Flying at 250ft AGL with 75/70 overlap.
How do you guys handle GCP placement on long linear sites? Every 500ft on alternating sides? Or cluster them differently?
Also, how many checkpoints vs control points on something this long? I'm thinking 15-20 GCPs and 8-10 checkpoints.